World Cup Special • Save up to $1000 on selected vehicles

Toyota
Chery
JETOUR
Geely Auto
BYD
Volkswagen
CHANGAN
Great Wall
MG
Xiaomi Auto
Li Auto
Honda
GlobalEnglishopenopenopen

GradeS
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition

Certified Dealer
Guazi Inspected
Original paint
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Front Left 45 Deg
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Exterior 1
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Exterior 2
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Exterior 3
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Exterior 4
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Exterior 5
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Steering Wheel
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Instrument Cluster
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Odometer Close Up
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Audio And AC Panel
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Gear Lever
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Left Front Seat
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Headliner
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Trunk
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Interior 1
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Interior 2
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Interior 3
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Interior 4
Used Hyundai ix35 2021 2.0L Automatic 2WD GLS Leading Edition Engine Bay
Download all
1/19
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 8
Thumbnail 9
Thumbnail 10
Thumbnail 11
Thumbnail 12
Thumbnail 13
Thumbnail 14
Thumbnail 15
Thumbnail 16
Thumbnail 17
Thumbnail 18
Thumbnail 19

Vehicle Details

Item Noevm8rs6ygd
VINLBE**********9860
Mfg. Date2023.03
1st Reg. Date2023.06
Model Year2021
Mileage (km)19,600
Fuel TypeGasoline
TransmissionAT
Engine2.0L
Horsepower (ps)160.49
Drive TrainFront-engine FWD
Body StyleSUV
Seats5
Doors5
Exterior ColorWhite
Dimension (mm)4500*1850*1715
Curb Weight (kg)1430
SteeringLeft
LocationShenyang, China

Inspection Report

Guazi Official Inspection
level-bglevel
  • No Accident Damage
    No Accident Damage
  • No Water Damage
    No Water Damage
  • No Fire Damage
    No Fire Damage
  • Exterior Design
    107
    2
  • Interior Trim
    43
  • Configuration Features
    51
    2
  • Structural Components
    29
  • Reinforcement Parts
    15
  • Cockpit Conditions
    15

Specifications

Engine

Engine Model
G4NJ
Displacement (L)
2.0
Cylinder Arrangement
L
Number of Cylinders
4
Valves per Cylinder
4
Valve Train
DOHC
Maximum Horsepower (ps)
160.49
Maximum Power (kw)
118
Maximum Power Speed (rpm)
6500
Maximum Torque (N·m)
193
Maximum Torque Speed (rpm)
4500
WLTC Combined Fuel Consumption (L)
7.3

Features

Smartphone ConnectivityHD High Beam LightsAuto HoldKeyless EntryBackup CameraHD Low Beam LightsEngine Start/Stop SystemAutomatic HeadlightsCruise ControlPush Button StartRear Air VentsTPMSHSARear Parking SensorsAnti-Pinch Windows

Inquire Now

  1. Step 1

    ORDER

    Vehicles with "Buy Now" can be ordered online. For others, please contact a consultant to check and order.
  2. Step 2

    PAYMENT

    Pay a $300 deposit to secure the vehicle. You can complete the payment online or by wire transfer.
  3. Step 3

    SHIPPING

    Upon completion of vehicle reconditioning and export documentation, we will ship the vehicle to the designated port of destination.
  4. Step 4

    PICKUP

    Clear customs and pick up the vehicle at the destination port.
Item No:evm8rs6ygd
Mfg. Date2023.03
Fuel TypeGasoline
Mileage (km)19,600
TransmissionAT
Engine2.0L
Horsepower (ps)160.49
FOB Price
$13,045$13,445
Shipping from: Shanghai, China
Help Me Buy

Popular Used Car

About Guazi Used Cars

Learn more

Founded in 2015, Guazi has evolved into China's premier automotive trading platform. By connecting buyers and sellers and helping facilitate millions of car deals, we have fundamentally transformed the used car ecosystem in China.

With over a decade of experience, Guazi has built a reputation for reliability, transparency, and service excellence in the global used vehicle export industry. Our innovative online platform combines comprehensive vehicle inspections with real-time inventory updates. Through our advanced logistics network and dedicated customer support team, we ensure every vehicle meets our stringent quality standards before beginning its journey to your location.

Our Mission

While we remain rooted in our goal of enabling every family to own a quality vehicle, our global mission is to empower and connect international car dealers and importers. By providing easy, reliable, and cost-effective access to China's vast vehicle inventory, Guazi helps drive your business to success in local markets.

Learn more
INVENTORY
200K+

Vehicles Listed Annually

TRANSACTIONS
300K+

Vehicles Transacted Annually

AUTHENTICITY
100%

Direct from Individual Owners

PARTNERS
100K+

Dealerships Served Globally

QUALITY
200+

Points of Rigorous Inspection

LOGISTICS
4,000+

Global Shipping Routes

TEAM
10K+

Staff Around the World

USER
800K+

Daily Active Users